Qualvecom is one of Ireland’s largest distributors of automotive components, with a reputation for unequaled service to its customers since the business commenced over 40 years ago and acts as Irish Distributor for a number of the biggest global manufacturers of original equipment parts.

The primary work undertaken for Qualvecom was the design and installation of a three tier structural mezzanine floor with a loading capacity of 5.0Kn/m2. The structure in total measures 342sq/m over the three tiers with project specific ‘up and over’ safety gates to all levels.

A pick-tower with over 2,500 shelf locations on a footprint of just 102sq/m was also fitted. With integrated stairs to all levels, a three tier shelving system, standing five metres high overall and a bay load of 3,000kg UDL, this design allowed Qualvecom to maximise the use of allowable space while minimising cost.

Mesh backs to each shelving unit allow for extra light and five spacious walkways facilitate ease of access and productive, timely use.

Client Testimonial: “The overall design, planning and installation by Allied was top class. Any questions I had, throughout the whole process, from the initial tender, right through to the completed project were addressed quickly and with clarity. I’m very pleased with the finished article. It has given us more space and greater efficiency in our daily operations, as well as provided us the opportunity to further utilise our remaining space in a cost effective way, should be wish to do so”, Tony Geoghegan, Operations Manager, Qualvecom.

Client: Qualvecom

Location: Dublin 12

Product: Mezzanine Floor, Steel Shelving

Qualvecom is one of Ireland’s largest distributors of automotive components, with a reputation for unequaled service to its customers since the business commenced over 40 years ago and acts as Irish Distributor for a number of the biggest global manufacturers of original equipment parts.

The primary work undertaken for Qualvecom was the design and installation of a three tier structural mezzanine floor with a loading capacity of 5.0Kn/m2. The structure in total measures 342sq/m over the three tiers with project specific ‘up and over’ safety gates to all levels.

A pick-tower with over 2,500 shelf locations on a footprint of just 102sq/m was also fitted. With integrated stairs to all levels, a three tier shelving system, standing five metres high overall and a bay load of 3,000kg UDL, this design allowed Qualvecom to maximise the use of allowable space while minimising cost.

Mesh backs to each shelving unit allow for extra light and five spacious walkways facilitate ease of access and productive, timely use.

Client Testimonial: “The overall design, planning and installation by Allied was top class. Any questions I had, throughout the whole process, from the initial tender, right through to the completed project were addressed quickly and with clarity. I’m very pleased with the finished article. It has given us more space and greater efficiency in our daily operations, as well as provided us the opportunity to further utilise our remaining space in a cost effective way, should be wish to do so”, Tony Geoghegan, Operations Manager, Qualvecom.